Allseas giant construction vessel Pioneering Spirit is well underway with the redevelopment project’s decommissioning campaign. In early August, Allseas’ vessel removed the 14,000-tonne and 7,780-tonne topsides at Tyra East and Tyra West.
In close cooperation with Bel Air, DHSS is assisting both Pioneering Spirit as well as its offshore construction vessel Fortitude with helicopter crew change flights. With the air support, we are able to bring crew and cargo to both vessels during their further activities at the Tyra Project site.